Capacity

Plan jobs against available hours, qualified operations, and floor space

Available qualified hours960 h
Committed hours656 h
Remaining304 h
Utilization68%
Facility / capability
Columbus, OH
312 / 40078%
288 / 40072%
240 / 240100%
328 / 40082%
216 / 40054%
0 / 4000%
Large cable
312 / 40078%
192 / 40048%
192 / 24080%
328 / 40082%
0 / 4000%
0 / 4000%
Harness assembly
0 / 2400%
96 / 24040%
48 / 14433%
0 / 2400%
216 / 24090%
0 / 2400%
Greenville, SC
240 / 28086%
240 / 28086%
168 / 168100%
248 / 28089%
254 / 28091%
0 / 2800%
Large cable
0 / 2800%
176 / 28063%
128 / 16876%
52 / 28019%
210 / 28075%
0 / 2800%
Small wire
132 / 16083%
64 / 16040%
40 / 9642%
0 / 1600%
0 / 1600%
0 / 1600%
Harness assembly
108 / 24045%
0 / 2400%
0 / 1440%
196 / 24082%
44 / 24018%
0 / 2400%
Phoenix, AZ
270 / 28096%
128 / 28046%
144 / 16886%
180 / 28064%
144 / 28051%
0 / 2800%
Large cable
270 / 28096%
0 / 2800%
144 / 16886%
180 / 28064%
0 / 2800%
0 / 2800%
Harness assembly
0 / 1600%
128 / 16080%
0 / 960%
0 / 1600%
144 / 16090%
0 / 1600%

Columbus, OH

Capacity available

112hours open

8 floor stations · 12 available operators

Large cable · Harness assembly

Greenville, SC

Capacity available

40hours open

6 floor stations · 9 available operators

Large cable · Small wire · Harness assembly

Phoenix, AZ

Capacity available

152hours open

5 floor stations · 8 available operators

Large cable · Harness assembly

Planning constraints

Week of Nov 16

Material first

Jobs start only after their allocated materials are available.

Qualified operations

Large cable, small wire, and harness work use separate qualified-hour limits.

Shared capacity

Skill pools share the facility total. The same hours cannot be booked twice.

Floor stations

Available floor stations limit simultaneous work and handling space.

Facility calendar

Nov 26 and Nov 27 are non-production days. That week has 60% of normal hours.

What if hours increase?

Compare a capacity allowance before approving overtime

+0 h

Utilization becomes 68%. Released jobs keep their reserved slots until a revised plan is approved.